Foundation Wall Stabilization and Tuckpointing — Port Byron, Illinois
A block foundation in Port Byron, Illinois had movement along its north wall and mortar joints so deteriorated that daylight showed through. Behncke Construction installed three heavy-duty steel braces with gussets, tuckpointed about 13 feet of interior wall, repaired exterior joints, and sealed a crack at the northeast corner.










