Project overview

Behncke Construction installed a new egress window in the block foundation of this Muscatine home, giving the basement more natural light and an emergency escape route.

On the job

What we found. Once the digging started, the crew ran into two things that could not be seen during the estimate: a concealed brick ledge and a foundation deeper than normal. Both made the installation more involved than planned.

The crew worked through the extra excavation and cutting, set the new window and well, and finished the job in two days. Behncke honored the original estimate and did not raise the price.

Standing behind our word matters as much as the work itself. Behncke Construction has served Muscatine and the Quad Cities since 1948.

Photo highlights

  • The finished egress well with its cover in place.
  • The spot along the foundation before digging.
  • Excavation started for the egress well.
  • The excavation taken down against the foundation.
  • The new window opening from inside, looking out to the well ladder.
  • The new opening cut into the block foundation.
  • The finished window and well from above.

Related services

Thinking about an egress window?

Behncke Construction installs egress windows in Muscatine and across the Quad Cities, and we stand behind our estimates. Request a free estimate or call (563) 332-6045.

From the field

Why they called. Basement needed natural light and an emergency escape route.

What we found. A concealed brick ledge and a foundation deeper than normal, neither visible during the estimate.

What we did. Excavated and installed a new egress window and well in the block foundation.

Not what we expected. The hidden brick ledge and extra foundation depth made the installation more involved than anticipated; the original estimate was honored without a price increase.

Result. Egress window completed in two days at the original estimated price.